CEG incoming correspondence

Source

Date received

Title

Files

ITU BR

2022-06-29

LS from ITU-R WP 5D: Update to IEGs engaged in the ‘After Year 2021’ evaluation of the new candidate technology submission from “Nufront Proponent”

Cover email from the BR

R19-WP5D-220613-TD-0700!R2!MSW-E_out.docx

ITU BR

2022-04-20

Final list of registered IEG related to Nufront candidate technology submission for IMT-2020 (ITU-R M.2150)

Final list of registered IEG related to Nufront candidate technology submission for IMT-2020 (ITU-R M.2150).pdf

NUFRONT

2022-03-11

The online workshop of EUHT-5G RIT submission

Cover email from NUFRONT

Readme regarding the following two files:

220310-2_EUHT_5G_RIT_ALL_Changes_Track.docx

220310-3_EUHT_5G_RIT_ALL_Changes_Track_Except_Format.docx

WP 5D

2022-03-08

LS: Completed revision of Recommendation ITU-R M.2150-1.

Cover email from the BR

R19-WP5D-220207-TD-0550!R1!MSW-E_out.docx

WP 5D

2021-03-18

LS: Update to IEGs engaged in the ‘Way Forward Option 2’ re-evaluation of the “ETSI (TC DECT) and DECT Forum Proponent” and of the “Nufront Proponent” candidate technology submissions.

Cover email from the BR

R19-WP5D-210301-TD-0297!R2!MSW-E_out_cor.docx

WP 5D

2021-02-12

LS: Completion of the 1st release of the detailed specifications of the radio interfaces for the terrestrial component of IMT-2020 in Recommendation ITU-R M.2150

Cover email from the BR

ITU-R WP 5D LS to EO on M.2150.docx

ETSI

2021-02-04

ETSI Evaluation Group Status

MSG(21)000002_Liaison_Statement_EVAL_WG_to_other_IEG.pdf

ETSI

2021-01-31

Draft Report of MSGEVAL#03

From: Chairman, ETSI

Contact: Andreas Wilzeck (Sennheiser), Guillermo Vietti (ETSI), Louise Clarke (ETSI)

 

MSGEVAL(21)004001_Meeting_report_MSGEVAL_03.docx

NUFRONT

2021-01-19

Carrier Aggregation in EUHT

CoverEmail_from_NUFRONT

Spectrum Aggregation.pdf

Huawei

2021-01-12

Discussions on IMT-2020 technology proposals (IMT-2020/17 and IMT-2020/18) in WP 5D

Warning: Information provided in confidence to the CEG – do not distribute further!

Cover_email-20210112.pdf

DECT technology analysis(Version 1.1) .pptx

EUHT technology analysis (version 2) .pptx

WP 5D

2020-10-27

LS: Invitation to IEGs to re-engage in Step 4 evaluation of the “ETSI (TC DECT) and DECT Forum Proponent” and of the “Nufront Proponent” candidate technology submissions for IMT-2020

Email from the BR.htm

5D_TD_201r1_Invite_for_ Step_4.docx

ITU-R

2020-09-23

Invitation to IEGs to join WP 5D meeting #36 (5-16 October)

Invitation-2020-09-23.htm

WP 5D

2020-07-15

LS on Information on the decision of the candidate radio interface technologies for the terrestrial component of
IMT-2020

Email from the BR.htm

5D_TD_158e_IMT-2020.docx

Draft_new_Rec M.[IMT-2020.SPECS].docx

WP 5D

2020-05-13

Conversion for Working Party 5D Meeting #35 to fully virtual meeting

Email from the BR.htm

WP 5D

2020-03-06

LS on Information on the evaluation results of the candidate radio interface technologies for the terrestrial components of IMT-2020

Email from the BR.htm

5D_TD_95e_IMT-2020.docx

WP 5D

2020-02-27

Summary of Step 4 of the IMT-2020 process for evaluation of IMT-2020 candidate technology submissions

Doc. IMT-2020/38

Huawei

2020-01-30

IMT-2020 Evaluation for EUHT, DECT and TSDSI

Warning: Information provided in confidence to the CEG – do not distribute further!

IMT-2020 Evaluation_Huawei_20200127.pdf

Huawei and ZTE

2020-01-24

Docs from ZTE and Huawei on EUHT

Warning: Information provided in confidence to the CEG – do not distribute further!

Docs from ZTE and Huawei on EUHT.zip

Ericsson

2020-01-14

Analysis of TSDSI submission (Huawei)

pptx

Ericsson

2020-01-14

DECT observations (Ericsson)

pptx

Ericsson

2020-01-14

TSDSI observations (Ericsson)

pptx

WP 5D

N/A

Selected IMT-2020 documents – Observations of WP 5D SWG evaluation: 26R1 (ETSI (TC DECT) & DECT Forum)), 27R1 (Nufront), and 28R1 (TDSI)

All IMT-2020 documents

Chairman, WP 5D

Downloaded on 2020-01-09 (Chapter 1 not yet available)

Report on the thirty-third meeting of Working Party 5D (Geneva, 10-13 December 2019)

R19-WP5D-C_200109_164810_99.zip

Chairman, WP 5D

2019-12-19

Method of referencing the candidate input submissions

E-mail from Stephen Blust

Summary of IMT-2020 Documents V1.docx

ITU BR

2019-12-18

LS on Availability of Addendum 5 to Circular Letter 5LCCE59

Email from the BR

5D_TD_31e_IMT2020.docx

ATIS

2019-11-13

Request for Additional Information from TSDSI and ETSI/DECT Forum (IMT-2020 Proponents)

E-mail from ATIS

WTSC-RAN-2019-00163R000_TSDSI.docx

WTSC-RAN-2019-00164R000_DECT.docx

ITU BR

2019-11-08

Reminder to Proponents and Independent Evaluation Groups for IMT-2020 Workshop

Email reminder from the BR

TSDSI

2019-11-07

Evaluation of TSDSI RIT for IMT-2020 submitted to ITU-R WP 5D

Email from TSDSI to Ven Sampath.pdf Email from TSDSI to José Costa.pdf

TSDSI

2019-10-19

Questions and clarifications about the TSDSI LMLC link budget

TSDSI-20191019-CoverPage.pdf

Clarification_request_TSDSI_link-budget_CEG_Final.docx

ITU BR

2019-09-11

Receipt of Supplemental Materials from ETSI (TC DECT), Nufront, & TSDSI for their respective IMT-2020 Candidate Technology Submissions

E-mail from ITU BR.htm

ATIS

2019-08-06

Request for TSDSI IMT-2020 Proponent Evaluation Results

Request for TSDSI IMT-2020 Proponent Evaluation Results.htm

ITU-R WP 5D

2019-07-24

LS on: Availability of Addendum 4 to Circular Letter 5/LCCE/59

LS-TD786-CoverPage.pdf

5D_TD_786e_All.docx

ITU-R WP 5D

2019-07-23

LS on: Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020

LS-TD769R1-CoverPage.pdf 5D_TD_769Rev1e_LS_IEGs.docx

ITU-R WP 5D

2019-07-23

LS on: The detailed schedule for finalization of the first release of new Recommendation ITU-R M.[IMT-2020.SPECS]

LS-TD736-CoverPage.pdf 5D_TD_736e_IMT2020.docx

ITU-R WP 5D

2018-10-26

LS: Availability of updated information related to proposals for the terrestrial components of the radio interface(s) for IMT-2020

LS-TD662-CoverPage.pdf

5D_TD_662.docx

 

ITU-R WP 5D

2018-10-26

LS: Important information related to evaluation process and received initial evaluation report for the terrestrial components of the radio interface(s) for IMT-2020

LS-TD610-CoverPage.pdf

5D_TD_610.docx

ITU-R WP 5D

2018-10-26

LS: Information on ITU-R Working Party 5D Workshop on IMT-2020 Terrestrial Radio Interfaces Evaluation

LS-TD663R1-CoverPage.pdf

660_Info_Workshop_Jul_2019.docx

5D_TD_663Rev1.docx

ITU-R WP 5D

2018-07-02

Liaison statement to registered independent evaluation groups (copy for information to proponents ‘3GPP’, ‘Korea’, ‘China’ ‘ETSI’ and ‘TSDSI’) – “Availability of initial description template information and updated information related to proposals for the terrestrial components of the radio interface(s) for IMT-2020”

5D_TD_554.docx

WWRF

2018-05-31

5G K-Simulator & 5G Device Test bench

WWRF-5G K-Simulator_20180531.pdf

3GPP PCG

2018-05-14

Liaison statement from 3GPP PCG about the 3GPP IMT-2020 self-evaluation

PCG40_18.zip

ITU-R WP 5D

2018-02-14

Confirmation of receipt of initial description templates related to proposals for the terrestrial components of the radio interface(s) for IMT-2020

LS_EOs_5D_875_temp464r1.docx

ITU-R WP 5D

2018-02-14

Availability of initial description template information related to proposals for the terrestrial components of the radio interface(s) for IMT-2020

LS_EOs_5D_875_temp465r1.docx

`

ITU-R WP 5D

2017-10-19

Further information related to draft new report for IMT-2020 evaluation

LS_EOs_5D_758_temp441.docx

ITU-R WP 5D

2017-10-19

Further progress in development of the ITU-R Recommendation for the terrestrial components of the IMT-2020 radio interface(s)

LS_EOs_5D_758_temp394r1.docx